Testing results and finalized equipment specifications documented
Factory (FAT) and Site (SAT) Inspections
To ensure vendors deliver a product that meets all specifications, Root 3 produces testing procedures and functional acceptance testing (FAT) oversight prior to approving shipment. Root 3 ensures that all testing results and finalized equipment specifications are documented and delivered to the owner.
When all the individual pieces of an electrical system arrive at their final destination, that equipment must be installed, interconnected, and site-tested. Root 3 reviews the construction package and certifies that all necessary documentation for this field installation is correct and thorough. Root 3 develops testing procedures and coordinates the site acceptance testing (SAT) and certifies all testing documentation before delivering it to the owner/operator of the equipment.